Construction progress monitoring against the design, every week.
Progress reports say what people think is built. Drone surveys, scans and photos show what is actually built. Kaiinos compares them with the design and the plan, zone by zone.
- Drone survey 18 Nov loaded
- Compared with BIM
- Block B level 5 · 64% · plan 70%
- Column B5-12 · 42 mm off design
- Report sent · site manager
What construction progress monitoring is.
Construction progress monitoring is capturing site conditions over time and comparing them against project plans. It answers two questions: how much is built, and is it built as designed?
Progress
How much of each zone, level or activity is complete, against the schedule.
Quality
Whether what is built matches the design, within tolerance.
Quantities
Earthworks, stockpiles and materials measured from surveys, for payment and planning.
Record
A dated record of the site, useful for handover, claims and disputes.
Orthophotos and surface models of the whole site.
Point clouds of buildings and structures.
Walk-throughs captured on site.
BIM or CAD, the reference everything is checked against.
What should be built by now.
Progress is still reported by hand.
Construction productivity has grown only 1% a year over two decades, according to the McKinsey Global Institute. Reporting is part of the problem.
Walk the site
Progress is checked by people on site. A study of construction contracts found that progress monitoring often relies on manual, document-centric and labour-intensive methods.
Fill in the report
Percentages are estimated per activity and typed into the schedule or a spreadsheet.
Capture, then store
Drone flights, scans and photos are captured, but comparing them with the design takes time nobody has.
Find problems late
Deviations are found when the next trade arrives. Studies put direct rework at around 5% of construction cost.
What is built, against what should be.
Kaiinos compares each survey with the design and the schedule, and keeps every version.
Progress per zone
Built against planned, per zone, level or activity, from the latest survey.
block B · level 5 · 64% built plan 70% · week 47 → behind plan
Deviations from the design
Surveys and scans registered to the BIM and compared, the method behind automated progress and quality control.
column B5-12 42 mm off design · tol. 20 mm → engineer notified
Earthworks and stockpiles
Cut, fill and stockpile volumes from drone surveys, compared with design levels.
cut 1,240 m³ since 11 Nov stockpile 3 · 410 m³ design level · -0.2 m
Site logistics
Laydown areas, crane zones and routes kept current on the same map.
laydown moved · east gate crane 1 radius · 55 m route updated
A dated record
Every survey kept as a version, for handover, payment and claims.
v31 · 18 Nov 31 surveys since start export · PDF, IFC, GeoTIFF
From buildings to linear projects.
Construction
Buildings, sites and civil works.
Infrastructure
Roads, rail, bridges and utilities.
Energy and utilities
Solar parks, substations and grid projects.
A current site model, compared with the design.
Kaiinos works with the surveys you already capture and keeps the comparison running.
Site model from your data
BIM, drawings, drone surveys, scans and photos in one model of the site.
Weekly comparison
Each new survey compared with the design and the schedule.
Deviations to the right person
Each deviation located and sent to the engineer responsible.
Volumes for payment
Earthworks and stockpile volumes per survey, kept as a record.
Portfolio view
All projects side by side, with progress and open issues.
For robots on site
Scanning and layout robots work from the current model. See the construction page.
Start with one building or phase.
Prove it on one part of the site, then add the rest.
Pick a building or phase
And the question that matters most: progress, quality or volumes.
Load the design
We register your BIM or drawings with the site.
Compare the first survey
Progress and deviations per zone, sent to the right people.
Repeat weekly
Then add more buildings, phases or projects.
Frequently asked questions
What is construction progress monitoring?
Capturing the state of a construction site over time and comparing it with the design and the schedule, to see how much is built and whether it is built correctly.
How is construction progress measured?
Traditionally by site staff estimating the percentage complete per activity. Increasingly with drone surveys, laser scans and 360 photos compared against the BIM or drawings.
What is scan to BIM comparison?
Registering a laser scan or survey to the design model and measuring the differences, so deviations beyond tolerance can be found and located.
How often should a site be surveyed?
Most sites survey weekly or every two weeks. Busy phases or critical structures may need more often.
Do we need a BIM model?
A BIM model gives the most detail, but drawings and design levels also work, especially for earthworks and linear projects.
Does Kaiinos fly the drones?
No. We work with the drone surveys, scans and photos your teams or contractors already capture. Kaiinos does the comparison and keeps the site model current.
Related reading and solutions.
Mapping with drones
Methods, accuracy and drone rules.
Read →What is a digital twin?
The basics, and how a twin stays current.
Read →Satellite imagery analysis
New structures, cleared ground and lost vegetation, found in satellite images.
Satellite imagery analysis →Change detection
What changed on site, and where.
All of change detection →Your site changes every day. Know how it compares to the plan.
Tell us about one project and the surveys you already capture.