INDUSTRIES · CONSTRUCTION

Build what was designed. Know the moment it isn't.

Sites change every day and the design changes with them. Kaiinos keeps one current model of the site, compared with the BIM, for the people who build it and the robots and drones that measure it.

SMARTOUT · BLOCK A · LEVELS 1-6SITE MODEL V31
LEVEL 3 · 42 MM OFF BIMLAYDOWN AREA · MOVEDLEVELS 5-6 · PLANNEDSCAN ROUND · LEVEL 1
  1. Robot scan of level 3 loaded
  2. Column C4 · 42 mm off BIM
  3. Laydown area moved
  4. Drone survey · cut and fill
  5. Site model v30 → v31
4/6Levels built
1Deviation
v31Site model
Construction today

More pressure, fewer people.

Construction is under pressure on productivity, labour and safety, and BIM has become the common language for the design.

Productivity lags

The McKinsey Global Institute found construction labour productivity grew only 1% a year over two decades, against 2.8% for the world economy.

Skilled trades are short

The European Labour Authority reports shortages especially evident in construction, with plumbers, electricians and carpenters short in most member states.

Safety is still the issue

In 2023, almost a quarter of fatal accidents at work in the EU happened in construction, mostly falls and being struck by vehicles.

The challenges

Where it breaks today.

The design is detailed. The picture of what is actually built is not, and it falls behind every day.

01

Deviations are found late

Studies put direct rework at around 5% of construction cost, and up to 15% of contract value on some projects.

02

Data does not reach the site

An FMI study found poor project data and miscommunication responsible for 48% of rework in the US.

03

Scans pile up

Laser scans, drone flights and photos are captured, but comparing them with the BIM takes time nobody has.

04

Robots need the current site

Scanning and layout robots work from a model of the site. If that model is out of date, they scan or print against the wrong plan.

Use cases

One site model, five uses.

Pick a use case to see how it works.

USE CASE 01

Progress and deviations against the BIM

Scans and photos are registered to the BIM and compared, the method behind automated progress and quality control. Deviations are flagged before the next trade builds on them.

  • Progress per zone and per level
  • Deviations flagged against tolerance
  • Each finding sent to the right engineer
Solves: deviations are found late
COLUMN C4 · 42 MM OFFLEVEL 3 · 92% AS PLANNEDLEVELS 4-5 · BIM
Smartout in action

Progress, deviations and logistics in one view.

Smartout shows the site as a current model over the BIM. Switch between progress, deviations, logistics and earthworks.

SmartoutSite modelCurrent state and changes, per siteProgressDeviationsLogisticsEarthworksBlock A · site model v31AreasTick an area to show its changesBlock A2Block B0Car park1Basement0Façade east3Roads0Utilities1Landscaping0Level 3 · column C4Deviation from BIM42 mm eastTolerance± 20 mmSourceRobot scan, 06 NovStatusSent to site engineerLevel 3BIM overlayLayersZones done12Zones in progress4Deviations1Crane swing1Laydown areas2Changes06 NOV · SCANLevel 3 C4: 42 mm off BIM06 NOV · DRONECut 1,240 m³ since Monday06 NOV · LOGISTICSLaydown area moved06 NOV · PLANLevel 4 zone 2 startedDone72%Deviations1Versionv31
All areas in one list

Blocks, basements, façades and roads, each with open items.

BIM overlay

Compare what is built with what was designed.

Deviation details

How far off, the tolerance, the source and who has it.

Layers per team

Progress, deviations, crane zones and laydown areas.

Versions

Every scan and survey kept with its date.

How it works

From your data to one current model.

Kaiinos works with your BIM and site data and keeps the site model current.

STEP 01

Bring in your data

BIM models, drawings, laser scans, drone surveys and site photos go into one model of the site.

STEP 02

Detect what changed

New scans and surveys are registered to the BIM and compared, and each deviation is located.

STEP 03

Share one picture

Site managers, engineers, subcontractors and robots work from the same version.

STEP 04

Keep it current

Every scan becomes a version, so the site's history is there for handover and claims.

BIM modelsCAD drawingsLaser scansDrone surveys360 photosSite logistics plansRobot scan data
How a pilot works

Start with one building.

Prove it on one building or one phase, then add the rest of the site.

STEP 01

Pick one building

One building or phase, and the question that matters most.

STEP 02

Load the BIM and scans

We register your BIM with the latest scans and surveys.

STEP 03

Run the first comparison

Progress and deviations per zone, sent to the right people.

STEP 04

Repeat and extend

Weekly or daily comparisons, more buildings and robots.

Questions

Frequently asked questions

What is a construction digital twin?

A current digital representation of the site, connected to what is actually built. The Gemini Principles note that what distinguishes a digital twin from any other model is its connection to the physical twin.

How does scan vs BIM work?

Scans and photos are registered in the BIM's coordinate system and compared with the design, which allows automated progress and quality control.

Which BIM standards do you work with?

ISO 19650 is the international standard for managing information with BIM. The 2014 EU procurement directive lets member states require BIM tools on public works.

Do you work with site robots?

Yes. Robots such as Spot can carry laser scanners on routine scanning routes, and layout robots print from the model. Kaiinos keeps the model they work from current.

Does Kaiinos replace our BIM software?

No. You keep your BIM tools. Kaiinos compares what is built with the BIM and keeps the site model current.

Start with one building. See what was built, against what was designed.

Tell us which project and what you need to check.

Start a pilot

hello@kaiinos.ai